Sign up to save this quote
This is a public demo. Your edits don't persist. Sign up to keep your work.
Quote Review
⚡ AI Draft generated in 52.62sCustomer
Gulf Coast Helicopters
Aircraft
Bell 407 / N407GC
Inspection
100-Hour Inspection
Generated
2026-04-14 20:06
41
Line Items
69.5
Total Hours
$8,687.50
Total Labor
$6,341.37
Total Parts
$15,028.87
Grand Total
$17,283.20
NTE (incl. 15%)
Review Progress
0%
| Task Code | Description | Hours | Rate | Parts Est. | Total | Status | Actions | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Engine Controls | 3.5h | $473.91 | $911.41 | ||||||||||||||||||||
| 76-10-00-001 |
Perform engine control rigging check including FCU and governor adjustment
📄
76-00-00
76-00-00
Bell 407 AMM
Inspect engine controls per Chapter 76.
AMM
Bell 407 AMM
### Rigging Verification Procedure
1.
AMM
Bell 407 AMM
**Fuel control unit (FCU) rigging:**
a.
Historical avg: 2.2h
|
Cyclic estimate: 2.5h
(+15%)
|
2.5 | $125.00 |
$198.57
|
$511.07 | pending high | Read-only demo | ||||||||||||||||
| 76-20-00-001 |
Inspect fuel control unit mounting, linkage, and fuel lines
📄
76-20-00
76-20-00
Bell 407 AMM
## 76-20-00 Fuel Control Unit Inspection
### Procedure
1. Inspect the fuel control unit (FCU) mounting for security.
AMM
Bell 407 AMM
Inspect the FCU input lever and linkage for wear, corrosion, and freedom of movement.
AMM
Bell 407 AMM
Inspect fuel lines to and from the FCU for chafing, leaks, and security.
Historical avg: 2.2h
|
Cyclic estimate: 1.0h
(-54%)
|
1.0 | $125.00 |
$275.34
|
$400.34 | pending medium | Read-only demo | ||||||||||||||||
| Engine Oil System | 2.0h | $404.75 | $654.75 | ||||||||||||||||||||
| 79-10-00-001 |
Collect engine oil sample for spectrometric oil analysis
📄
79-10-00
79-10-00
Bell 407 AMM
---
# Chapter 79 — Engine Oil System
## 79-10-00 Spectrometric Oil Analysis
### General
Spectrometric oil analysis (SOA) is a critical tool for monitoring engine internal wear.
AMM
Bell 407 AMM
### Sample Collection Procedure
1.
AMM
Bell 407 AMM
Obtain the sample from the engine oil tank drain valve using a clean sample bottle.
Historical avg: 0.8h
|
Cyclic estimate: 0.5h
(-40%)
|
0.5 | $125.00 |
$132.24
|
$194.74 | pending medium | Read-only demo | ||||||||||||||||
| 79-10-00-002 |
Remove, cut, and inspect engine oil filter for metallic contamination
📄
79-10-00
79-10-00
Bell 407 AMM
## 79-10-00 Engine Oil Filter Inspection
### Procedure
1. Remove the engine oil filter bowl assembly from the oil filter housing (located on the accessory gearbox).
AMM
Bell 407 AMM
Cut the filter element using an approved oil filter cutting tool.
Historical avg: 0.8h
|
Cyclic estimate: 1.0h
(+20%)
|
1.0 | $125.00 |
$134.24
|
$259.24 | pending high | Read-only demo | ||||||||||||||||
| 79-20-00-001 |
Remove and inspect engine chip detector for metallic particles
📄
79-20-00
79-20-00
Bell 407 AMM
## 79-20-00 Engine Chip Detector Inspection
### Procedure
1. Remove the engine chip detector plug from the accessory gearbox sump (lower location).
AMM
Bell 407 AMM
Inspect the magnetic plug for metallic particles.
Historical avg: 0.8h
|
Cyclic estimate: 0.5h
(-40%)
|
0.5 | $125.00 |
$138.27
|
$200.77 | pending medium | Read-only demo | ||||||||||||||||
| Engine Turbine | 3.5h | $342.24 | $779.74 | ||||||||||||||||||||
| 72-10-00-001 |
Perform borescope inspection of gas generator and power turbine wheels
📄
AMM
AMM
Bell 407 AMM
### Borescope Inspection Procedure (100-Hour)
1. Remove the borescope inspection plugs from the engine case (two plugs: one for the first-stage gas generator turbine and one for the first-stage power turbine).
AMM
Bell 407 AMM
Insert a rigid or flexible borescope and inspect the first-stage gas generator turbine wheel:
- Blade tips: Look for tip erosion, burning, or curling.
Historical avg: 2.5h
|
Cyclic estimate: 2.5h
(exact match)
|
2.5 | $125.00 |
$156.46
|
$468.96 | pending high | Read-only demo | ||||||||||||||||
| 72-20-00-001 |
Inspect interstage seals and exhaust stack for cracks and leakage
📄
72-20-00
72-20-00
Bell 407 AMM
## 72-20-00 Interstage Seal and Exhaust Stack
### Inspection
1. **Interstage seals:** During the borescope inspection, observe the interstage seal area between the gas generator turbine and power turbine.
AMM
Bell 407 AMM
**Exhaust stack inspection:**
a.
Historical avg: 2.5h
|
Cyclic estimate: 1.0h
(-60%)
|
1.0 | $125.00 |
$185.78
|
$310.78 | pending medium | Read-only demo | ||||||||||||||||
| General | 16.0h | $948.45 | $2,948.45 | ||||||||||||||||||||
| 53-10-00-001 |
Inspect cabin structure for cracks, corrosion, loose rivets, and deformation
📄
07-53-10
07-53-10
Bell 407 AMM
Inspect cabin structure for cracks, corrosion, loose rivets, and deformation. Pay particular attention to the lower cabin skin at station 108.0 and station 136.0 where fatigue cracking has been observed in service. Refer to SB 407-53-108 for updated inspection criteria.
|
1.5 | $125.00 |
$99.93
|
$287.43 | pending low | Read-only demo | ||||||||||||||||
| 56-10-00-001 |
Inspect all windows and windshield for crazing, delamination, and security
📄
AMM
AMM
Bell 407 AMM
Inspect all windows and windshield for crazing, delamination, and security of attachment. Windshield panels shall be replaced if any crack exceeds 2.0 inches in length or if crazing reduces pilot visibility below acceptable limits.
|
1.0 | $125.00 |
$91.71
|
$216.71 | pending low | Read-only demo | ||||||||||||||||
| 32-10-00-001 |
Inspect landing gear skid tubes, crosstubes, and saddles for damage and security
📄
20-00-00
20-00-00
Bell 407 AMM
Inspect landing gear skid tubes, crosstubes, and saddles for damage, distortion, and security. Check crosstube-to-saddle bolt torque at 150-175 in-lbs. Refer to Chapter 20-00-00 for torque values.
|
1.0 | $125.00 |
$68.27
|
$193.27 | pending low | Read-only demo | ||||||||||||||||
| 52-10-00-001 |
Inspect all doors and latches for proper operation and wear limits
📄
AMM
AMM
Bell 407 AMM
Inspect all doors and latches for proper operation. Door hinge pins shall show no wear exceeding 0.005 inches on the pin diameter.
|
0.5 | $125.00 |
$99.64
|
$162.14 | pending low | Read-only demo | ||||||||||||||||
| 53-20-00-001 |
Inspect tailboom attachment bolts and skins for cracks, dents, and corrosion
📄
AMM
AMM
Bell 407 AMM
Inspect tailboom attachment bolts for proper torque (350-400 in-lbs) and safety wire. Inspect tailboom skins for cracks, dents, and corrosion, especially in the area of the horizontal stabilizer attachment at station 267.0.
|
1.5 | $125.00 |
$71.82
|
$259.32 | pending low | Read-only demo | ||||||||||||||||
| 55-10-00-001 |
Inspect horizontal stabilizer for cracks, debonding, and mounting bolt security
📄
AMM
AMM
Bell 407 AMM
Inspect horizontal stabilizer for cracks, debonding, and mounting bolt security. Mounting bolt torque: 80-100 in-lbs.
|
1.0 | $125.00 |
$50.74
|
$175.74 | pending low | Read-only demo | ||||||||||||||||
| 67-10-00-001 |
Inspect swashplate assembly for wear, corrosion, and freedom of movement
📄
AMM
AMM
Bell 407 AMM
Inspect swashplate assembly for wear, corrosion, and freedom of movement. Check swashplate bearing play per the limits in the Component Maintenance Manual.
|
1.5 | $125.00 |
$85.10
|
$272.60 | pending low | Read-only demo | ||||||||||||||||
| 29-10-00-001 |
Inspect hydraulic system for leaks, reservoir level, and filter condition
📄
AMM
AMM
Bell 407 AMM
Inspect hydraulic system for leaks, reservoir level, and filter condition. Hydraulic fluid: MIL-PRF-83282. Reservoir capacity: 1.5 quarts. Minimum fluid level for dispatch: 1.0 quart.
|
2.0 | $125.00 |
$72.47
|
$322.47 | pending low | Read-only demo | ||||||||||||||||
| 24-10-00-001 |
Inspect electrical system including battery, generator, and circuit breakers
📄
AMM
AMM
Bell 407 AMM
Inspect electrical system including battery, generator, bus bars, and circuit breakers. Battery specific gravity: 1.275-1.300 when fully charged.
|
1.5 | $125.00 |
$69.40
|
$256.90 | pending low | Read-only demo | ||||||||||||||||
| 34-10-00-001 |
Inspect pitot-static system for blockage and perform altimeter correlation check
📄
AMM
AMM
Bell 407 AMM
Inspect pitot-static system for blockage and leaks. Perform altimeter correlation check per 14 CFR 91.411 if required.
|
1.0 | $125.00 |
$94.80
|
$219.80 | pending low | Read-only demo | ||||||||||||||||
| 28-10-00-001 |
Inspect fuel system including cells, lines, valves, and filter service
📄
AMM
AMM
Bell 407 AMM
Inspect fuel system, including cells, lines, valves, and fuel filter. Drain fuel filter/water separator bowl. Check fuel boost pump operation.
|
1.5 | $125.00 |
$76.37
|
$263.87 | pending low | Read-only demo | ||||||||||||||||
| 27-10-00-001 |
Inspect flight controls for travel, rigging, and rod end bearing wear
📄
AMM
AMM
Bell 407 AMM
Inspect flight controls for full travel, freedom of movement, and proper rigging. All control rod end bearings shall be checked for wear.
|
2.0 | $125.00 |
$68.20
|
$318.20 | pending low | Read-only demo | ||||||||||||||||
| Lubrication & Servicing | 4.0h | $364.46 | $864.46 | ||||||||||||||||||||
| 12-10-00-001 |
Service all lubrication points including spindles, pitch links, and bearings
📄
12-10-00
12-10-00
Bell 407 AMM
### 12-10-00 Lubrication Chart — 100-Hour Items
The following lubrication points shall be serviced at intervals not exceeding 100 flight hours:
1. **Main rotor spindle bearings (4 locations):** Apply MIL-PRF-81322 grease through the zerk fitting on each spindle.
AMM
Bell 407 AMM
**Main rotor pitch link rod ends (8 bearings):** Apply MIL-PRF-81322 grease to each rod end bearing.
AMM
Bell 407 AMM
**Swashplate bearings (upper and lower):** Apply MIL-PRF-81322 grease through the zerk fittings on the swashplate support.
Historical avg: 2.2h
|
Cyclic estimate: 2.5h
(+15%)
|
2.5 | $125.00 |
$180.03
|
$492.53 | pending high | Read-only demo | ||||||||||||||||
| 12-20-00-001 |
Check and service hydraulic, transmission, and engine oil levels
📄
12-20-00
12-20-00
Bell 407 AMM
## 12-20-00 Fluid Levels and Servicing
### Hydraulic Reservoir
1.
AMM
Bell 407 AMM
Remove the filler cap and check fluid level on the sight glass.
AMM
Bell 407 AMM
### Transmission Oil
1.
Historical avg: 2.2h
|
Cyclic estimate: 1.5h
(-31%)
|
1.5 | $125.00 |
$184.43
|
$371.93 | pending medium | Read-only demo | ||||||||||||||||
| Main Rotor Drive | 5.0h | $543.97 | $1,168.97 | ||||||||||||||||||||
| 63-10-00-001 |
Inspect main transmission oil level, chip detectors, and external condition
📄
63-10-00
63-10-00
Bell 407 AMM
Inspect main transmission per Chapter 63-10-00. Check oil level, chip detectors, and external condition.
AMM
Bell 407 AMM
### 100-Hour Inspection Procedure
1. **External visual inspection:** Inspect the transmission housing for cracks, leaks, and security of mounting.
AMM
Bell 407 AMM
3. **Chip detector inspection:**
a.
Historical avg: 2.2h
|
Cyclic estimate: 2.5h
(+15%)
|
2.5 | $125.00 |
$76.99
|
$389.49 | pending high | Read-only demo | ||||||||||||||||
| 63-20-00-001 |
Inspect freewheeling unit operational check and engagement
📄
63-20-00
63-20-00
Bell 407 AMM
Inspect freewheeling unit per Chapter 63-20-00.
AMM
Bell 407 AMM
### Inspection Procedure
1. With the engine at idle, disengage the rotor brake and observe main rotor RPM.
Historical avg: 2.2h
|
Cyclic estimate: 1.0h
(-54%)
|
1.0 | $125.00 |
$366.03
|
$491.03 | pending medium | Read-only demo | ||||||||||||||||
| 63-10-00-002 |
Remove and cut transmission oil filter for metallic contamination inspection
📄
AMM
AMM
Bell 407 AMM
4. **Oil filter inspection:**
a. Remove the transmission oil filter bowl assembly.
AMM
Bell 407 AMM
Remove the filter element and inspect for metallic contamination.
Historical avg: 2.2h
|
Cyclic estimate: 1.5h
(-31%)
|
1.5 | $125.00 |
$100.95
|
$288.45 | pending medium | Read-only demo | ||||||||||||||||
| Main Rotor System | 8.5h | $774.24 | $1,836.74 | ||||||||||||||||||||
| 62-10-00-001 |
Inspect main rotor blades for erosion, cracks, delamination, and impact damage
📄
62-10-00
62-10-00
Bell 407 AMM
Inspect main rotor blades per Chapter 62-10-00. All four blades shall be inspected for erosion, cracks, delamination, and impact damage.
AMM
Bell 407 AMM
### 100-Hour Inspection Procedure
1.
07-62-14
Bell 407 AMM
**Leading edge erosion strip inspection:** Examine the full length of the titanium erosion strip from root to tip. Look for:
- Pitting deeper than 0.020 inches
- Erosion strip separation or delamination from the blade surface
- Leading edge nicks exceeding 0.125 inches in depth
- Any den
Historical avg: 3.3h
|
Cyclic estimate: 3.5h
(+5%)
|
3.5 | $125.00 |
$259.19
|
$696.69 | pending high | Read-only demo | ||||||||||||||||
| 62-10-00-002 |
Inspect main rotor hub assembly and yoke for cracks using dye penetrant methods
📄
62-10-00
62-10-00
Bell 407 AMM
Inspect main rotor hub assembly per Chapter 62-10-00. Check yoke for cracks using dye penetrant or fluorescent penetrant methods per Bell Process Specification BPS-4005.
62-10-00
Bell 407 AMM
## 62-10-00 Main Rotor Hub Inspection
### 100-Hour Inspection Procedure
1. Inspect the hub yoke assembly for cracks, corrosion, and mechanical damage. Pay particular attention to the spindle-to-yoke junction area.
Historical avg: 3.3h
|
Cyclic estimate: 2.5h
(-25%)
|
2.5 | $125.00 |
$238.73
|
$551.23 | pending medium | Read-only demo | ||||||||||||||||
| 62-20-00-001 |
Inspect pitch link assemblies and check rod end bearing play limits
📄
62-20-00
62-20-00
Bell 407 AMM
Inspect pitch link assemblies per Chapter 62-20-00. Check rod end bearing play; replace bearing if axial play exceeds 0.010 inches.
62-20-00
Bell 407 AMM
## 62-20-00 Pitch Link Assembly Inspection
1. Inspect each pitch link rod end bearing for wear. Check for axial play by grasping the rod end and attempting to move it along the axis of the bolt. Replace the bearing if axial play exceeds 0.010 inches.
Historical avg: 3.3h
|
Cyclic estimate: 1.5h
(-55%)
|
1.5 | $125.00 |
$128.26
|
$315.76 | pending medium | Read-only demo | ||||||||||||||||
| 62-30-00-001 |
Inspect lead-lag dampers for fluid leaks and proper charge pressure
📄
62-30-00
62-30-00
Bell 407 AMM
Inspect lead-lag dampers per Chapter 62-30-00 for fluid leaks and proper charge pressure.
62-30-00
Bell 407 AMM
## 62-30-00 Lead-Lag Damper Inspection
1. Inspect each elastomeric lead-lag damper for:
- Fluid leaks: Any visible fluid weeping from the damper body requires damper replacement.
Historical avg: 3.3h
|
Cyclic estimate: 1.0h
(-70%)
|
1.0 | $125.00 |
$148.06
|
$273.06 | pending medium | Read-only demo | ||||||||||||||||
| Powerplant | 7.0h | $1,225.80 | $2,100.80 | ||||||||||||||||||||
| 71-10-00-001 |
Inspect engine installation, mounts, cowling, and external accessories
📄
71-10-00
71-10-00
Bell 407 AMM
Inspect engine installation per Chapter 71-10-00.
AMM
Bell 407 AMM
### 100-Hour Inspection Procedure
1. **Engine cowling and firewall:** Remove engine cowling panels.
AMM
Bell 407 AMM
2.
Historical avg: 2.0h
|
Cyclic estimate: 2.5h
(+25%)
|
2.5 | $125.00 |
$122.79
|
$435.29 | pending medium | Read-only demo | ||||||||||||||||
| 71-20-00-001 |
Perform compressor wash to restore performance and reduce operating temperatures
📄
71-20-00
71-20-00
Bell 407 AMM
## 71-20-00 Compressor Wash
### Purpose
Compressor performance degrades over time due to contaminant buildup on the compressor blades and vanes.
AMM
Bell 407 AMM
### Procedure
1.
Historical avg: 2.0h
|
Cyclic estimate: 1.5h
(-25%)
|
1.5 | $125.00 |
$264.26
|
$451.76 | pending medium | Read-only demo | ||||||||||||||||
| 71-30-00-001 |
Remove, inspect, clean, and test fuel nozzle spray pattern
📄
71-30-00
71-30-00
Bell 407 AMM
## 71-30-00 Fuel Nozzle Inspection
### Procedure
1. Remove the fuel nozzle from the combustion liner.
AMM
Bell 407 AMM
Inspect the nozzle tip for carbon buildup, erosion, and cracking.
AMM
Bell 407 AMM
Check the spray pattern by connecting the nozzle to a calibrated fuel flow bench.
Historical avg: 2.0h
|
Cyclic estimate: 2.0h
(exact match)
|
2.0 | $125.00 |
$397.72
|
$647.72 | pending high | Read-only demo | ||||||||||||||||
| 71-40-00-001 |
Remove and inspect igniter plugs for electrode erosion and carbon deposits
📄
71-40-00
71-40-00
Bell 407 AMM
## 71-40-00 Igniter Plug Inspection
### Procedure
1. Remove both igniter plugs from the combustion liner.
AMM
Bell 407 AMM
Inspect each igniter plug for:
- Electrode erosion: Replace if the center electrode has eroded to within 0.040 inches of the shell.
Historical avg: 2.0h
|
Cyclic estimate: 1.0h
(-50%)
|
1.0 | $125.00 |
$441.03
|
$566.03 | pending medium | Read-only demo | ||||||||||||||||
| Scheduled Inspection | 4.5h | $47.09 | $609.59 | ||||||||||||||||||||
| 05-10-00-001 |
Complete 100-hour inspection card — all airframe and systems items per Section A through G
📄
05-10-00
05-10-00
Bell 407 AMM
### 05-10-00 100-Hour / Annual Inspection Card
The following inspection tasks shall be accomplished at intervals not to exceed 100 flight hours or 12 calendar months, whichever occurs first. All discrepancies noted during the inspection shall be corrected prior to return to service.
Historical avg: 4.5h
|
Cyclic estimate: 4.5h
(exact match)
|
4.5 | $125.00 |
$47.09
|
$609.59 | pending high | Read-only demo | ||||||||||||||||
| Standard Practices | 4.0h | $140.94 | $640.94 | ||||||||||||||||||||
| 20-00-00-001 |
Inspect safety wire installation and replace per standard practices
📄
20-10-00
20-10-00
Bell 407 AMM
### Table 20-1: Standard Torque Values
| Bolt Size | Fine Thread (in-lbs) | Coarse Thread (in-lbs) |
|-----------|---------------------|----------------------|
| #8-32 | 18-20 | 15-17 |
| #10-32 | 30-35 | 25-30 |
| 1/4-28 | 75-85
AMM
Bell 407 AMM
### Installation Procedure
1.
Historical avg: 2.2h
|
Cyclic estimate: 2.5h
(+15%)
|
2.5 | $125.00 |
$78.35
|
$390.85 | pending high | Read-only demo | ||||||||||||||||
| 20-00-00-002 |
Verify critical fastener torque values and hardware specifications
📄
20-00-00
20-00-00
Bell 407 AMM
---
# Chapter 20 — Standard Practices
## 20-00-00 Torque Values
### General Torque Requirements
Unless otherwise specified, all bolts, nuts, and screws shall be torqued in accordance with Table 20-1.
AMM
Bell 407 AMM
All critical fasteners shall be torqued using a calibrated torque wrench.
Historical avg: 2.2h
|
Cyclic estimate: 1.5h
(-31%)
|
1.5 | $125.00 |
$62.59
|
$250.09 | pending medium | Read-only demo | ||||||||||||||||
| Tail Rotor Drive | 3.5h | $460.89 | $898.39 | ||||||||||||||||||||
| 65-20-00-001 |
Inspect tail rotor gearbox oil level and magnetic chip detector
📄
65-20-00
65-20-00
Bell 407 AMM
Inspect tail rotor gearbox per Chapter 65-20-00. Check oil level and magnetic chip detector.
AMM
Bell 407 AMM
### 100-Hour Inspection Procedure
1.
AMM
Bell 407 AMM
**Oil level check:** Remove the oil level check plug (pipe plug at the 3 o'clock position on the gearbox).
Historical avg: 1.8h
|
Cyclic estimate: 1.5h
(-18%)
|
1.5 | $125.00 |
$88.24
|
$275.74 | pending high | Read-only demo | ||||||||||||||||
| 65-10-00-001 |
Inspect tail rotor driveshaft and hanger bearings for wear and security
📄
65-10-00
65-10-00
Bell 407 AMM
Inspect tail rotor driveshaft and hanger bearings per Chapter 65-10-00.
AMM
Bell 407 AMM
### 100-Hour Inspection Procedure
1. **Driveshaft section inspection:** Inspect each driveshaft segment for:
- Dents: No dent deeper than 0.020 inches is acceptable on any driveshaft tube.
AMM
Bell 407 AMM
2.
Historical avg: 1.8h
|
Cyclic estimate: 2.0h
(+9%)
|
2.0 | $125.00 |
$372.65
|
$622.65 | pending high | Read-only demo | ||||||||||||||||
| Tail Rotor System | 3.0h | $569.28 | $944.28 | ||||||||||||||||||||
| 64-10-00-001 |
Inspect tail rotor blades for erosion, delamination, and impact damage
📄
64-10-00
64-10-00
Bell 407 AMM
Inspect tail rotor blades per Chapter 64-10-00.
AMM
Bell 407 AMM
### 100-Hour Inspection Procedure
1.
AMM
Bell 407 AMM
**Leading edge inspection:** Examine the stainless steel erosion strip for:
- Dents exceeding 0.060 inches in depth
- Erosion that exposes the composite substrate
- Separation of the erosion strip from the blade body
Minor dents and nicks less than 0.060 inches deep may be blended sm
Historical avg: 1.8h
|
Cyclic estimate: 2.0h
(+9%)
|
2.0 | $125.00 |
$284.19
|
$534.19 | pending high | Read-only demo | ||||||||||||||||
| 64-10-00-002 |
Inspect tail rotor pitch change mechanism and bearings
📄
64-10-00
64-10-00
Bell 407 AMM
Inspect tail rotor pitch change mechanism per Chapter 64-10-00.
64-10-00
Bell 407 AMM
## 64-10-00 Pitch Change Bearings and Crosshead
### Inspection Procedure
1. Inspect the tail rotor pitch change bearings (2 per blade, 4 total) for:
- Freedom of rotation: The bearing must rotate smoothly with no roughness or binding.
Historical avg: 1.8h
|
Cyclic estimate: 1.0h
(-45%)
|
1.0 | $125.00 |
$285.09
|
$410.09 | pending medium | Read-only demo | ||||||||||||||||
| Vibration Analysis | 5.0h | $45.35 | $670.35 | ||||||||||||||||||||
| 18-10-00-001 |
Perform main rotor vibration survey and track and balance procedure
📄
18-10-00
18-10-00
Bell 407 AMM
Perform vibration survey per Chapter 18-10-00.
18-10-00
Bell 407 AMM
### Equipment Required
- Chadwick-Helmuth Vibrex 4000 or Aces Systems 2100 (or equivalent)
- Accelerometer kit with mounting hardware
- Reflective tape for blade tracking
- Stroboscope (Strobex or equivalent)
### 18-10-00 Main Rotor Track and Balance Procedure
1. Install the accelerometer on the
Historical avg: 3.5h
|
Cyclic estimate: 3.5h
(exact match)
|
3.5 | $125.00 |
$13.18
|
$450.68 | pending high | Read-only demo | ||||||||||||||||
| 18-10-00-002 |
Perform tail rotor vibration survey and record balance data
📄
18-20-00
18-20-00
Bell 407 AMM
## 18-20-00 Vibration Survey — Tail Rotor
1. With the main rotor at 100% Nr, record the tail rotor 1-per-rev vibration at the tail boom accelerometer station (station 260.0).
Historical avg: 3.5h
|
Cyclic estimate: 1.5h
(-57%)
|
1.5 | $125.00 |
$32.17
|
$219.67 | pending medium | Read-only demo | ||||||||||||||||
| TOTAL | 69.5 | $8,687.50 | $6,341.37 | $15,028.87 | |||||||||||||||||||
| DISCREPANCY ALLOWANCE (15%) | $2,254.33 | ||||||||||||||||||||||
| NOT-TO-EXCEED (NTE) | $17,283.20 | ||||||||||||||||||||||
Parts estimates are preliminary. Actual parts costs confirmed during inspection.
NTE includes 15% discrepancy allowance for findings during inspection. Actual charges will not exceed NTE without customer approval.
This is a public demo. Your edits don't persist. Sign up to keep your work.